Date: 2014
Owner: Ministry of Transportation (MTO)
Description: Structure Rehabilitation. This project included bridge removal, rehabilitation and modification of existing abutment and wingwalls with structural concrete, new bridge deck, with waterproofing, paving and guardrails.